![]() |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
| DR-2U-300 Slide Rail Kit installation | |
|
click to view large picture
click to view large picture
click to view large picture
|
The Rail Kit to mount chassis to 19" wall mounted cabinet/frame consists of two symmetric Holders - left and right. Each Holder consists of two parts - Holder itself (1) that supports shassis and Bracket (2) that fixes holder in rack and makes holder rigid. Fasten Brackets to Holders with nuts (3) as shown on the picture on the left.
Install 10 cage nuts in the cabinet/frame (not supplied with the Kit). Refer to the picture on the left. You should install 5
cage nuts (red marked): 3 - on the front (3) and 2 - on the side of the rack (1). Tighten the both Holders with 4 appropriate
screws: 2 - on the front (4) and 2 - on the side of racks (2), (5). You need to tighten 8 screws total.
Slide the D21 based system along the pre-installed Holders in the suitable rack. Tighten the rest 2 screws on the opposite side
of the front panel where it attaches to the rack. |
| DR-2U-500 Slide Rail Kit installation | |
|
click to view large picture
click to view large picture
click to view large picture
|
The DR-2U-500 Slide Rail Kit to mount chassis to 19" wall mounted cabinet/frame consists of two symmetric Holders - left and right. Each Holder consists of two parts - Front Bracket (1) and Back Bracket (2). Slide together the front to back sections of the Holders as shown on the picture on the left. Extend the Holders to the length required to fit the rack or cabinet before you install it. The DR-2U-500 Kit supports rack fixing distance on depth L from 400mm to 638mm. Notify, there are two variants to join Back Bracket (A and B). Screw on appropriate nuts (3) (supplied with the Kit) to each bracket, and tighten the front and the back sections.
Install 10 cage nuts in the rack (not supplied with the Kit). Refer to the picture on the left. You should install
5 cage nuts (red marked): 3 - on the front rack (1) and 2 - on the back rack of the frame. Tighten the both Holders with 4 appropriate screws for EACH SIDE of the rack (left
and right, front and back). You need to tighten 8 screws total.
Slide the D21 based system along the pre-installed Holders in the suitable rack. Tighten the rest 2 screws on the opposite side
of the front panel where it attaches to the rack. |
|
| Home | Contact Us | About Us | |
| © Just-Cases.com. 2011 | Last updated Oct. 5, 2011 |